Home > About Us > CX2

Computer Exchange 1

Complete Design, Consulting and Program Management of CX2 Computer Exchange:

  • Purpose Built TIER 3 High End 320,000 ft2 DC facility
  • 30 to 150W/ft2 Power Density
  • Initial 16MVA with provision to expand to 32MVA Power from Utility
  • Multiple Back Up power generation
  • Multiple UPS systems
  • Chilled Water & Air Cooled Precision Cooling System
  • Water Mist Fire Suppression Systems
  • Data Cabling and Management
  • Multiple MDF facilities
  • Security Access, Intrusion and Alarm
  • 39” Raised Floor Height 10 kN/m2 Floor Loading

Other data centers :
Computer Exchange 1 (CX1) and Computer Exchange 3 (CX3)